FixFin — Automotive Equipment Financing
COLLISION & BODY SHOP

THE SPRAY BOOTH
EQUIPMENT GUIDE

THE BIGGEST LINE ON THE REFINISH QUOTE. How Canadian body shops evaluate a spray booth — the categories, the sizing factors, the surrounding system, and how the purchase becomes a financing project.

AUDIENCE: BODY SHOP OWNERS & OPERATORS7 MIN READLAST UPDATED: SEPTEMBER 2026REVIEWED BY FIXFIN EQUIPMENT FINANCE TEAM
Clean unbranded automotive spray booth with its doors open showing the bright filtered interior in a professional refinish facility.

The paint booth is the single largest equipment investment most collision facilities make — and the one that defines refinish quality and throughput. It's also one of the most financeable: identifiable equipment, clear commercial purpose, a project scope a vendor can itemize.

This guide covers the buying considerations at the business level. Airflow engineering, installation and code compliance belong to the booth manufacturer, your vendor and qualified professional installers — this is about choosing, quoting and financing.

THE AIRFLOW CATEGORIES — CONCEPTUALLY

Booths are commonly described by their airflow approach — downdraft, semi-downdraft, crossdraft and side-draft configurations — each with different facility and performance implications. Which approach suits your shop is a conversation with your booth vendor about your building, your volume and your budget: the category names matter for the quote, the engineering behind them belongs to the manufacturer.

No airflow calculations or ventilation engineering here — booth performance specifications come from the equipment manufacturer and applicable codes.

WHAT SHAPES THE CHOICE

01

VEHICLE SIZE & MIX

Cars only, or trucks and vans? Large-format booths change the footprint, the price and the facility requirements.

02

THROUGHPUT

How many refinish cycles the shop runs per week decides whether one booth is the constraint — and whether prep stations matter more than a second booth.

03

FACILITY FOOTPRINT

Booths are major facility equipment — bay dimensions, floor conditions, ducting paths and building characteristics matter. Site requirements come from the manufacturer and your vendor's installation plan.

04

HEATING & AIR MAKE-UP

Canadian climate makes the air-handling package part of the booth decision — air make-up units and heating configurations are commonly quoted with the booth.

05

NEW VS USED

New booths arrive with current airflow design and controls; eligible used booths may be considered — relocation and re-commissioning documentation weigh most.

HAVE THE BOOTH PROPOSAL?

Upload it with your application — FixFin starts from your supplier's numbers, whether it's one booth or a complete refinish system.

UPLOAD YOUR QUOTE

THE BOOTH IS A SYSTEM, NOT A BOX

Shops that get the most from a booth quote it as a system: booth, prep stations to keep it painting, a mixing room behind it, curing equipment in the workflow, and the air and extraction infrastructure underneath. Each piece has its own line on the quote — and together they structure as one financing project.

PAINT PREP STATION FINANCING

INSTALLATION — HIGH-LEVEL ONLY

Booth installation involves real project scope: placement, ducting, mechanical and electrical connection, and fire and code considerations. The specifics come from the manufacturer's requirements, your vendor's installation plan and applicable building, fire, electrical and environmental codes — with qualified professionals doing the work. Keep the installation scope itemized on the quote so the project review sees the whole investment.

QUOTES & FINANCING

Ask your vendor for an itemized quote covering the booth, controls and lighting, the air make-up package where applicable, and installation where offered — and the prep, mixing and curing equipment if you're quoting the refinish system together. Where eligible, installation and freight costs may be considered as part of the request depending on the transaction.

A booth can be financed on its own or as the anchor of a complete refinish package in one application, from one vendor or several.

FREQUENTLY ASKED QUESTIONS

APPLY TODAY

FINISH THE JOB.
FINANCE THE BOOTH.

START YOUR APPLICATION
REQUEST FINANCING